Appendix E. Average surface and groundwater concentration (µg/L) of nitrate-nitrogen (NO3-N) and soluble reactive phosphorus (PO4-P) associated with flooding of the experimental flood and outside-levee control sites on the disconnected floodplain.
1993 1994 1995 Control site
groundwaterFlood site groundwater Flood site surface water Control site
groundwaterFlood site groundwater Flood site surface water Control site
groundwaterFlood site groundwater Flood site surface water NO3-N Pre-flood na na na 17
± 4 (39)19
± 3 (39)na 11
± 1 (50)17
± 5 (38)na Flood period 11
± 3 (45)28
± 1 (36)12
± 6 (34)10
± 2 (142)9
± 2 (143)3
± 1 (53)5
± 1 (150)9
± 3(150)6
± 2 (50)Post-flood na na na 6
± 1 (17)11
± 1 (16)na 12
± 1 (33)17
± 10 (29) na PO4-P Pre-flood na na na 29
± 3 (51)24
± 3 (48)na 36
± 4 (51)51
± 11 (39)na Flood period 48
± 6 (43)41
± 5 (34)62
± 3 (20)36
± 3 (126)50
± 6 (114)80 ± 8 (59) 36
± 2 (150)50
± 5 (149)82
± 7 (50)Post-flood na na na 27
± 4 (17)24
± 2 (16) na 40
± 7 (16)50
± 7 (14) na Notes: Data are means ± SE (n) for samples taken before, during, and following experimental flooding for each of three experimental floods (19931995). na = data not available.